Cell manufacturing/EOL Testing

From KIproBatt Wiki
< Battery value chain‎ | Process‎ | Cell manufacturingBattery value chain/Process/Cell manufacturing/EOL Testing /
Revision as of 12:06, 15 June 2021 by Christina Leinauer (talk | contribs) (Created page with "{{Semantic Element |label=Cell manufacturing/EOL Testing |description===Production process== *Before the cells leave the factory, they are tested in an EOL test rig. *The...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Battery value chainProcessCell manufacturingCell manufacturing/EOL Testing


Description

Production process

  • Before the cells leave the factory, they are tested in an EOL test rig.
  • The cells are removed from the good carriers in the aging racks and fed to the testing station.
  • Here they are discharged to the shipping state of charge (capacity measurement).
  • Depending on the manufacturer, pulse tests, internal resistance measurements (DC), optical inspections, OCV tests and leakage tests are carried out.
  • After testing, many cell manufacturers sort the cells according to their performance data (grading).
  • Once the tests have been completed passed successfully, the cells can be packed and shipped.
  • For transport, the cells are usually provided with a plastic cover and stacked in a cardboard box.

Process parameters & requirements

  • State of charge of the cell for shipping: 5 % - 20 % SOC
  • Permissible loss rate: < 5 mV per week
  • Increased loss rate: > 5mV per week may indicate e.g. cell-internal short circuits

Technology alternatives

  • Different test sequences and durations exist depending on the cell manufacturer.

Quality influences

  • Cell handling

Quality characteristics

  • Low self-discharge
  • Low internal resistance
  • Constant capacity

Source

Heimes, H.H.; Kampker, A.; Lienemann, C.; Locke, M.; Offermanns, C.; Michaelis, S.; Rahimzei, E. (2018) Lithium-Ion Battery Cell Production Process; PEM of RWTH Aachen and VDMA, 3rd Edition, ISBN:978-3-947920-03-7


Semantic Links

Add or edit outgoing links
To edit incoming links, go to the subjects site.

Outgoing

Incoming

Semantic Statements

Add statement


External Identifiers

IRI: