| | The KIproBatt project aims at increasing the Overall Equipment Effectiveness (OEE) by improving the quality factors: | | The KIproBatt project aims at increasing the Overall Equipment Effectiveness (OEE) by improving the quality factors: |
| | | | |
| − | * Reduction of scrap parts | + | *Reduction of scrap parts |
| − | * Reduction of reworking parts | + | *Reduction of reworking parts |
| − | * Integration of real-time sensor data | + | *Integration of real-time sensor data |
| | | | |
| | | | |
| Line 16: |
Line 16: |
| | | | |
| | <math>Quality = \frac{\text{flawless products}}{\text{actual output}} \times 100</math> | | <math>Quality = \frac{\text{flawless products}}{\text{actual output}} \times 100</math> |
| | + | <br /> |
| | | | |
| | '''Base value''' | | '''Base value''' |
| Line 22: |
Line 23: |
| | | | |
| | <math>Quality = \frac{\text{no. produced parts - (no. rework + no. scrap)}}{\text{no. produced parts}}</math> | | <math>Quality = \frac{\text{no. produced parts - (no. rework + no. scrap)}}{\text{no. produced parts}}</math> |
| | + | <br /> |
| | | | |
| | '''Current state''' | | '''Current state''' |
| | | | |
| | No improvement achieved yet, as laboratory battery production has not yet started. | | No improvement achieved yet, as laboratory battery production has not yet started. |
| | + | <br /> |
| | | | |
| | '''Target value''' | | '''Target value''' |
| | | | |
| | The quality parameter should be increased by approx. 5%. | | The quality parameter should be increased by approx. 5%. |
| | + | <br /> |
| | | | |
| | | | |
| Line 36: |
Line 40: |
| | The KIproBatt project aims at decreasing the Total Cost of Operations (TCO) by improving the subsequent factors: | | The KIproBatt project aims at decreasing the Total Cost of Operations (TCO) by improving the subsequent factors: |
| | | | |
| − | * Reduction of energy consumption | + | *Reduction of energy consumption |
| − | * Cost of operating materials (e.g., reduction in the use of operating materials, avoidance of waste) | + | *Cost of operating materials (e.g., reduction in the use of operating materials, avoidance of waste) |
| − | * Integration of real-time sensor data | + | *Integration of real-time sensor data |
| | | | |
| | | | |
| Line 79: |
Line 83: |
| | The KIproBatt project aims at increasing the share of digital interfaces that are integrated in the production process. This share is measured by combining two factors: | | The KIproBatt project aims at increasing the share of digital interfaces that are integrated in the production process. This share is measured by combining two factors: |
| | | | |
| − | * Share of data points that are recorded for a single cell. | + | *Share of data points that are recorded for a single cell. |
| − | * Share of data points that is assigned to a single cell without human intervention (automatically). | + | *Share of data points that is assigned to a single cell without human intervention (automatically). |
| | | | |
| | | | |